Heartsaver First Aid Part I

Progress Indicator:
Question 4 of 22

4.  As a general rule, the operator or superintendent of each mine shall cause to be made by a registered mining engineer or registered professional surveyor an accurate, professional quality map of the mine, on a scale of not less than _______ feet to the inch.  (Section 224)

Choices:
  1. 200
  2. 400
  3. 500
  4. 1,000


See more about these products