Heartsaver First Aid Part I
Progress Indicator:
 
Question 4 of 22
4. As a general rule, the operator or superintendent of each mine shall cause to be made by a registered mining engineer or registered professional surveyor an accurate, professional quality map of the mine, on a scale of not less than _______ feet to the inch. (Section 224)
Choices:
- 200
- 400
- 500
- 1,000
|
|
|
|